News

EXCON, a.s. - PF 2025

19. 12. 2024

EXCON, a.s. - PF 2025

THANK YOU FOR YOUR COOPERATION IN 2024. WE WISH YOU A LOT OF PERSONAL AND PROFESSIONAL SUCCESS IN 2025. MANAGEMENT OF COMPANY EXCON, A.S.

Footbridge in the town Radotín, Czech Republic

16. 01. 2023

Footbridge in the town Radotín, Czech Republic

Original concrete footbridge across the river Berounka from the year 1994 in state of disrepair was replaced by steel cable stayed bridge using adapted original foundation. New 110m long all-welded triangular lattice structure from tubes 3,6m wide is divided by one tube 24 m high pylon, pined to…